The Erosfire Project

Materials & Methods PDF Print E-mail
  
Monday, 12 January 2009 22:02

Field instalations

 

Installation of rainfall gauges and sediment fences, followed by runoff plots (slope-scale and micro-plots) and, more recently, soil moisture sensors.

Figure 1 - Sediment fence just after instalation.

Figure 2 - Sediment fence full of sediments.

 

Figure 3 - Runoff tanks.

Figure 4 - Automatic rainfall gauge.

Figure 5 - Open Plots.

Figure 6 - Bounded plots.

 

 

Hydrometric station (H-flume, ultrasound water-level sensor, turbidity sensor, and automated sampler).

 

Figure 7 - Overview of H-flume.

   
        

 

Flight mission for obtaining high-resolution aerial photography and, based thereupon, a high-resolution DTM. We ourselves do the ground work for this mission, i.e. placing control point on the ground and measuring their coordenates with GPS.

In near future - erosion control experiment with hydromulching.

 

 

 

 

 

 

 

 

 

 

Last Updated ( Wednesday, 25 March 2009 10:17 )
  No Comments.
Discuss this item on the forums. (0 posts)

Login

Copyright © 2012 The Erosfire Project. All Rights Reserved.
Joomla! is Free Software released under the GNU/GPL License.